The first hull of the new bluewater Swan 58 is out of the mould

01/05/2020 - 11:53 in Sailing boat by Nautor's Swan

The transparent gelcoat, used on the first hull both for bottom and topsides, is employed to better detect any possible imperfection in the infusion process.

New Swan 58 under construction

At the moment, the hull is still at the yard in Kållby where it will be completed with structural details, go through a thorough quality check and then be transported over to the Boat Technology Centre for assembly work.

New Swan 58 under construction


The joinery shop has already started working on the interiors and pre-assembly of electrical components is underway.  At the same time, the deck mould will soon be ready to enable deck lamination to start.

 

Copyright © 2022 Pressmare All Rights Reserved